Pressure Vessel Ongoing Maintenance Program
| |
|
| Document No. |
JDS-PRJ-MEC-001 |
| Revision |
C |
| Date |
2026-03-25 |
| Status |
CURRENT |
| Author |
N. Johansson |
What Is This?
A complete, reusable service for managing ongoing maintenance and inspection of pressurised vessels. Built on Swedish regulations (AFS 2017:3) as the foundation, designed to be adapted to any country’s requirements.
This is a service you can offer to clients: “I will set up and manage your pressure vessel maintenance program, ensuring regulatory compliance and full documentation traceability.”
The JDS system drives the entire workflow — every inventory, inspection plan, supervision round, and inspection report is a JDS document with full traceability.
The Maintenance Cycle
SET UP → INVENTORY → CLASSIFY → PLAN → INSPECT → REPORT → UPDATE → REPEAT
│ │ │ │ │ │ │
│ TMP-LOG-002 Reg.Ref TMP-LOG-004 Accredited TMP-RPT-003 Equipment
│ (inventory) (plan) Inspector (report) Register
│ Update
└── JDS-PRO-010 (master procedure) governs every step
How This Program Is Organised
JDS-PRJ-MEC-001_pressure-vessel-maintenance/
│
├── 01-framework/ ← UNIVERSAL (works in any country)
│ ├── JDS-LOG-MEC-001_equipment-register.md ← Master register template
│ ├── JDS-PRO-004_inspection-planning.md ← How to schedule inspections
│ └── JDS-MAN-MEC-001_documentation-guide.md ← What records you must keep
│
├── 02-regulations/ ← COUNTRY-SPECIFIC rules
│ └── SE-sweden/
│ ├── regulatory-reference.md ← AFS 2017:3 practical reference
│ └── regulatory-traceability-matrix.md ← Maps JDS procedures to AFS 2017:3
│
├── 03-active-programs/ ← CLIENT WORK (real data)
│ ├── JDS-LOG-MEC-002_*.md ← AFS 2017:3 inventory guide
│ └── [client-name]/ ← One folder per client
│ ├── JDS-LOG-MEC-NNN_inventory.md ← Client equipment register
│ ├── JDS-LOG-MEC-NNN_inspection-plan.md ← Annual inspection plan
│ ├── inspections/ ← JDS-RPT-MEC-NNN reports
│ ├── supervision/ ← JDS-LOG-MEC-NNN checklists
│ ├── certificates/ ← Inspector certificates
│ └── vessel-files/ ← Per-vessel documentation
│
└── CHANGELOG.md ← Master log of ALL changes
How to Run a Maintenance Program
Follow JDS-PRO-010 (Ongoing Maintenance Program Procedure) for the complete workflow. Quick reference:
| Step |
What to Do |
JDS Template |
| 1. Create client folder |
Set up 03-active-programs/[client]/ |
— |
| 2. Build equipment register |
Walk the site, record every vessel |
JDS-TMP-LOG-002 |
| 3. Classify vessels |
Determine risk class A/B, PED category |
Regulatory reference |
| 4. Build inspection plan |
Schedule all inspections for the year |
JDS-TMP-LOG-004 |
| 5. Perform supervision |
Regular supervision walk-arounds |
JDS-TMP-LOG-003 |
| 6. Perform inspections |
Accredited inspector (Class A) or own (Class B) |
JDS-TMP-RPT-003 |
| 7. Report and update |
Document findings, update register |
JDS-PRO-008 |
Procedures
| Doc No. |
Title |
| JDS-PRO-010 |
Ongoing Maintenance Program Procedure |
| JDS-PRO-004 |
Inspection Planning Procedure |
| JDS-PRO-008 |
Corrective Action Procedure |
| JDS-PRO-009 |
Competence Management Procedure |
Templates
| Doc No. |
Title |
Use |
| JDS-TMP-LOG-002 |
Supervision Inventory Template |
Equipment register |
| JDS-TMP-LOG-003 |
Supervision Checklist Template |
Supervision checklists |
| JDS-TMP-LOG-004 |
Annual Inspection Plan Template |
Annual inspection plan |
| JDS-TMP-RPT-003 |
Inspection Report Template |
Post-inspection reports |
Framework
| Doc No. |
Title |
| JDS-LOG-MEC-001 |
Equipment Register (Framework) |
| JDS-MAN-MEC-001 |
Documentation Guide |
| JDS-LOG-MEC-002 |
Pressure Vessel Inventory Guide |
How to Expand to a New Country
- Create a new folder under
02-regulations/ (e.g., NO-norway/)
- Document that country’s pressure vessel regulations
- Create a traceability matrix mapping JDS procedures to those regulations
- The templates and procedures still apply — only the regulatory reference changes
You never touch the Swedish files to add another country.
Revision History
| Rev |
Date |
Author |
Description |
| A |
2026-03-25 |
N. Johansson |
Initial release — project structure and framework |
| B |
2026-03-25 |
N. Johansson |
Added maintenance workflow, linked to PRO-010, templates, and active program structure |
| C |
2026-03-25 |
N. Johansson |
Language authority update — all terminology now JDS English. Added regulatory traceability matrix. |