Inspection Report — [Vessel ID] [Inspection Type]
| |
|
| Document No. |
JDS-RPT-MEC-[NNN] |
| Revision |
DRAFT |
| Date |
YYYY-MM-DD |
| Status |
DRAFT |
| Author |
[Inspector / Report author] |
| Project |
JDS-PRJ-MEC-001 |
| Client |
[Client name] |
1. Inspection Summary
| |
|
| Vessel ID |
[PV-001] |
| Description |
[e.g., Compressed air receiver] |
| Location |
[Site, building, bay] |
| Inspection date |
YYYY-MM-DD |
| Inspection type |
Utvändig / Invändig / Tryckprov / Driftprov |
| AFS Klass |
A / B |
| Inspector |
[Name, organisation] |
| Accreditation No. |
[SWEDAC number, if applicable] |
| Result |
GODKÄND / GODKÄND MED ANMÄRKNING / UNDERKÄND |
| Certificate Ref |
[Inspector’s certificate number] |
2. Vessel Data (from Equipment Register)
| Parameter |
Value |
| Manufacturer |
|
| Serial No. |
|
| Year of manufacture |
|
| Design pressure (PS) |
bar |
| Design temperature (TS) |
°C |
| Volume |
L |
| Medium |
|
| Material |
|
3. Inspection Scope
Describe what was inspected and how:
4. Findings
4.1 Findings Table
| # |
Location |
Finding |
Severity |
Action |
| 1 |
|
|
Info / Minor / Major / Critical |
|
| 2 |
|
|
Info / Minor / Major / Critical |
|
4.2 Photographs
(Insert or reference photographs of findings here)
5. Wall Thickness Measurements (if applicable)
| Location |
Measured (mm) |
Nominal (mm) |
Min. Required (mm) |
OK |
| |
|
|
|
Yes / No |
| |
|
|
|
Yes / No |
6. Conclusion and Recommendation
Result: [GODKÄND / GODKÄND MED ANMÄRKNING / UNDERKÄND]
[Summary of the vessel’s condition and any required actions]
Next inspection due: YYYY-MM-DD ([Type])
7. Actions Required
| # |
Action |
Responsible |
Due Date |
Status |
| 1 |
|
|
|
Open / Closed |
| 2 |
|
|
|
Open / Closed |
8. Sign-Off
| |
|
| Inspector |
[Name] |
| Organisation |
[e.g., DEKRA Industrial AB] |
| Date |
YYYY-MM-DD |
| Report prepared by |
[Name — if different from inspector] |
Revision History
| Rev |
Date |
Author |
Description |
| DRAFT |
YYYY-MM-DD |
[Author] |
Inspection report for [Vessel ID] |