1. Purpose
This inventory is the master register of all pressurised vessels at [site name]. It serves as the foundation for the ongoing maintenance program by providing a single source of truth for:
- What equipment exists
- Where it is located
- What condition it is in
- When it needs inspection
If a vessel is not in this inventory, it does not exist in the maintenance program.
2. How to Use This Inventory
- Add a new vessel — one row per vessel, fill all mandatory fields
- Update after inspection — update Last Inspection, Next Inspection, Certificate Ref, and Status
- Review quarterly — check that no vessel has passed its Next Inspection date
- Revise the document — when vessels are added, removed, or reclassified, issue a new revision
3. Equipment Inventory
3.1 Column Definitions
| Column |
Description |
Example |
Mandatory? |
| Vessel ID |
Unique identifier for this vessel |
PV-001 |
Yes |
| Tag / KKS |
Plant tag number or KKS code (if applicable) |
1MAA01 BB001 |
If available |
| Description |
Plain language description |
Compressed air receiver |
Yes |
| Location |
Physical installation location |
Machine hall, bay 3 |
Yes |
| Manufacturer |
From nameplate |
Atlas Copco |
Yes |
| Model |
Manufacturer’s model/type designation |
LT 500 |
If available |
| Year Built |
Year of manufacture (from nameplate) |
2018 |
Yes |
| Serial No. |
Manufacturer’s serial number |
AC-2018-44521 |
Yes |
| Design Pressure (PS) |
Maximum allowable working pressure |
11 bar |
Yes |
| Design Temp |
Maximum allowable temperature |
200°C |
Yes |
| Volume (V) |
Internal volume |
500 L |
Yes |
| PS × V |
Pressure-volume product (for classification) |
5,500 bar·L |
Yes |
| Medium |
Contents of the vessel |
Compressed air |
Yes |
| Medium Group |
Group 1 (dangerous) or Group 2 (other) |
Group 2 |
Yes |
| Regulatory Class |
Classification per applicable regulation |
Class B |
Yes |
| CE Marked |
Does it carry a CE mark? |
Yes / No |
Yes |
| Notified Body |
CE notified body number (from nameplate) |
NB 0036 |
If CE marked |
| Safety Devices |
Relief valve, rupture disc, pressure switch |
SV set at 11.5 bar |
Yes |
| Last Inspection |
Date of most recent inspection |
2025-06-15 |
Yes (after first) |
| Inspection Type |
What type was performed |
External / Internal / Pressure test |
Yes (after first) |
| Next Inspection |
When next inspection is due |
2027-06-15 |
Yes |
| Inspector |
Who performed the last inspection |
DEKRA / Kiwa / Internal |
Yes (after first) |
| Certificate Ref |
Inspection certificate reference number |
DEKRA-2025-12345 |
Yes (after first) |
| Status |
Current operational status |
IN SERVICE |
Yes |
| Condition Rating |
Overall condition assessment |
Good / Acceptable / Monitor / Poor |
Recommended |
| Notes |
Important observations, defects, repair history |
Minor corrosion on weld seam |
As needed |
3.2 Status Values
| Status |
Meaning |
| IN SERVICE |
Operating normally, inspections current |
| IN SERVICE — MONITOR |
Operating but with known condition to watch |
| OUT OF SERVICE |
Temporarily removed from service (not decommissioned) |
| AWAITING INSPECTION |
Inspection is overdue or pending |
| DECOMMISSIONED |
Permanently removed from service |
| NEW — NOT YET COMMISSIONED |
Installed but not yet put into service |
3.3 Condition Ratings
| Rating |
Meaning |
Action |
| Good |
No defects, within design parameters |
Continue normal inspection schedule |
| Acceptable |
Minor wear/ageing within tolerance |
Continue normal inspection schedule |
| Monitor |
Condition noted that requires tracking |
Reduce inspection interval or add specific checks |
| Poor |
Significant deterioration or defect |
Immediate engineering assessment required |
4. Inventory Register
Copy the tables below and fill one row per vessel. Add rows as needed. Tables are linked by Vessel ID.
4.1 Identification
| Vessel ID |
Description |
Location |
Manufacturer |
Year |
Serial No. |
| PV-001 |
[example] |
[loc] |
[mfr] |
[yr] |
[s/n] |
| |
|
|
|
|
|
| |
|
|
|
|
|
4.2 Technical Data
| Vessel ID |
PS (bar) |
V (L) |
PS×V |
Medium |
Group |
Class |
| PV-001 |
[bar] |
[L] |
[bar·L] |
[medium] |
[1/2] |
[A/B/C] |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
4.3 Inspection Status
| Vessel ID |
Last Insp. |
Next Insp. |
Inspector |
Status |
| PV-001 |
[date] |
[date] |
[name] |
[status] |
| |
|
|
|
|
| |
|
|
|
|
5. Safety Device Register
Track safety devices (relief valves, rupture discs, pressure switches) separately for test scheduling.
| Device ID |
Type |
Protects Vessel |
Set Pressure |
Test Interval |
| SV-001 |
Relief valve |
PV-001 |
11.5 bar |
12 months |
| |
|
|
|
|
5.1 Safety Device Test Records
| Device ID |
Last Test |
Next Test |
Test Result |
Tested By |
| SV-001 |
[date] |
[date] |
Pass / Fail |
[name] |
| |
|
|
|
|
6. Inspection Calendar — Annual Overview
Fill in planned inspection dates for each vessel. Mark completed inspections with ✓.
| Vessel ID |
Q1 (Jan–Mar) |
Q2 (Apr–Jun) |
Q3 (Jul–Sep) |
Q4 (Oct–Dec) |
| PV-001 |
— |
EXT (Jun) |
— |
— |
| |
|
|
|
|
Inspection type codes: EXT = External, INT = Internal, PT = Pressure test, SV = Safety valve test
7. Decommissioned Vessels
Vessels removed from service are moved here for historical record.
| Vessel ID |
Description |
Date Decommissioned |
Reason |
Disposition |
| |
|
|
|
Scrapped / Sold / Relocated |
8. Document References
| Document |
JDS Reference |
Description |
| Regulatory reference |
[link to regulations] |
Applicable regulations and classification rules |
| Documentation guide |
[link to guide] |
What records to keep per vessel |
| Inspection planning |
[link to planning] |
How to plan and schedule inspections |
9. Komplekt Status (Per Vessel)
For each vessel in service, verify these documents exist:
Revision History
| Rev |
Date |
Author |
Description |
| DRAFT |
YYYY-MM-DD |
[Author] |
Initial draft |