| Document No. | JDS-RPT-001 |
| Revision | A |
| Date | 2026-03-25 |
| Status | EXAMPLE |
| Author | Nils Johansson |
| Project | N/A — Example document |
| Client | Internal |
Note: This is an example document to demonstrate how a JDS report looks when completed. The content is fictional but representative of a real field service report.
Inspection of the No. 2 cooling water pump at Facility X revealed excessive bearing wear and seal degradation. The pump is functional but requires bearing replacement and mechanical seal overhaul within the next 30 days to prevent unplanned failure.
The No. 2 cooling water pump (CW-P-002) was reported as showing increased vibration levels during routine monitoring. A visual inspection and basic measurements were requested to determine the cause and recommend corrective action.
Excluded: Internal disassembly, alignment check (requires pump isolation).
The pump exterior is in acceptable condition. No visible corrosion on the casing. Foundation bolts are tight. Coupling guard is in place.
| Location | Direction | Value (mm/s RMS) | Limit | Status |
|---|---|---|---|---|
| Drive end bearing | Horizontal | 4.2 | 4.5 | Warning |
| Drive end bearing | Vertical | 3.8 | 4.5 | OK |
| Non-drive end bearing | Horizontal | 6.1 | 4.5 | Alert |
| Non-drive end bearing | Vertical | 5.4 | 4.5 | Alert |
The non-drive end bearing shows vibration levels above the alert threshold per ISO 10816-3 for Class II machines.
| Location | Measured | Limit | Status |
|---|---|---|---|
| Drive end bearing | 62°C | 80°C | OK |
| Non-drive end bearing | 74°C | 80°C | Warning |
Visible drip rate from the mechanical seal: approximately 2 drops per second. This exceeds acceptable leakage for this seal type. Fluid observed is clear (cooling water, no oil contamination).
Last bearing replacement: 2023-11-15 (approx. 28 months ago). Recommended interval: 24 months. The pump is overdue for scheduled bearing maintenance.
| # | Recommendation | Priority | Deadline |
|---|---|---|---|
| 1 | Replace non-drive end bearing | High | Within 30 days |
| 2 | Inspect and replace mechanical seal | High | During bearing replacement |
| 3 | Check shaft alignment after bearing replacement | Medium | At reassembly |
| 4 | Review and update preventive maintenance schedule | Medium | Within 60 days |
| 5 | Repeat vibration measurement after repair to confirm | Low | After repair |
| Rev | Date | Author | Description |
|---|---|---|---|
| A | 2026-03-25 | Nils Johansson | Initial release (example document) |