theofficeofnilsjohansson

Equipment Inventory — Göteborg Workshop

   
Document No. JDS-LOG-MEC-003
Revision B
Date 2026-03-25
Status EXAMPLE
Author Nils Johansson

1. Purpose

This inventory provides a complete register of pressure vessels and pressurised equipment at the Göteborg Workshop facility. It fulfils the requirements of AFS 2017:3 (Användning och kontroll av trycksatta anordningar) and serves as the master reference for inspection planning.

2. Equipment Register

2.1 Identification

Vessel ID Description Location Manufacturer Year Serial No.
PV-001 Compressed air receiver Compressor room Atlas Copco 2018 AC-2018-4472
PV-002 Compressed air receiver Workshop south Pneumatech 2015 PT-15-882
PV-003 Hydraulic accumulator Press station 1 Hydac 2020 HY-20-1193
PV-004 Steam boiler Boiler house Bosch 2012 BSH-12-5561
HE-001 Shell & tube heat exchanger Engine room Alfa Laval 2019 AL-19-7034
AR-001 Nitrogen cylinder bank Gas store AGA 2021 AGA-21-0044

2.2 Technical Data

Vessel ID PS (bar) V (L) PS×V Medium Class
PV-001 11 500 5500 Air A
PV-002 10 250 2500 Air B
PV-003 250 50 12500 N₂/Oil A
PV-004 6 800 4800 Steam A
HE-001 16 120 1920 Glycol B
AR-001 200 50×6 60000 N₂ A

3. Inspection Status

Vessel ID Last Inspection Type Next Due Inspector Certificate Ref Status
PV-001 2025-06-15 Revision (internal) 2027-06-15 Kiwa Inspecta KI-2025-44721 IN SERVICE
PV-002 2025-03-20 External 2027-03-20 DEKRA DK-2025-8823 IN SERVICE
PV-003 2024-11-10 Revision (internal) 2026-11-10 Kiwa Inspecta KI-2024-39102 IN SERVICE — MONITOR
PV-004 2025-09-01 Revision (internal) 2026-09-01 DNV DNV-2025-SE-1147 IN SERVICE
HE-001 2025-01-22 External 2027-01-22 DEKRA DK-2025-1205 IN SERVICE
AR-001 2025-08-30 Periodic test 2035-08-30 Kiwa Inspecta KI-2025-50091 IN SERVICE

4. Safety Device Register

Device ID Type Protected Vessel Set Pressure (bar) Last Test Next Test Status
SV-001 Relief valve PV-001 11.5 2025-06-15 2027-06-15 OK
SV-002 Relief valve PV-002 10.5 2025-03-20 2027-03-20 OK
SV-003 Relief valve PV-003 260 2024-11-10 2026-11-10 OK
SV-004 Relief valve + rupture disc PV-004 6.5 2025-09-01 2026-09-01 OK
PS-001 Pressure switch (high) PV-004 5.8 2025-09-01 2026-09-01 OK

5. Annual Inspection Calendar 2026

Vessel Q1 (Jan–Mar) Q2 (Apr–Jun) Q3 (Jul–Sep) Q4 (Oct–Dec)
PV-001
PV-002
PV-003 R (Nov)
PV-004 R (Sep)
HE-001
AR-001

R = Revision (internal), E = External, P = Pressure test


Revision History

Rev Date Author Description
A 2026-03-25 Nils Johansson Example inventory for JDS demonstration
B 2026-03-25 Nils Johansson Split wide tables to ≤7 columns for A4 readability